Map the network first
I document the network type, active sites, mapped domains, network-activated plugins, themes, upload paths and any sunrise or domain-mapping configuration before moving data.
Database and uploads
The global tables and each site’s numbered tables are transferred together. Upload paths are checked because older networks and custom configurations may not follow the same layout as modern installations.
Domain and DNS planning
Subdomain networks may rely on wildcard DNS and wildcard TLS coverage. Domain-mapped sites each need their own DNS and certificate behavior understood before the cutover.
Per-site validation
Every site is checked individually for login, media, links and critical functionality. A network-level homepage working does not prove that all child sites migrated correctly.
Related services
What we confirm together
A multisite network is not simply a collection of independent exports. Shared users, network settings and domain mapping require attention. A single-site extraction from a network is a different scope from moving the entire installation.
Before starting, we agree on access, affected systems, testing, timing and the handover. Hosting subscriptions, premium software and work outside that scope are identified separately.