Move work out of the live window
Backups, bulk file transfer, destination configuration and most testing should happen before maintenance begins.
Estimate how cautious a production maintenance window should be from write activity, DNS, database sync and site type.
Adjust the inputs to generate a planning recommendation.
A maintenance window is not the same thing as total migration time. Most data can be copied and tested in advance. The production window should contain only the operations that require controlling live writes, final synchronization, routing changes and verification.
Backups, bulk file transfer, destination configuration and most testing should happen before maintenance begins.
A brochure site and an active store have very different tolerance for database drift during the final cutover.
Know which checks must pass before reopening the site and which failures trigger rollback rather than more live troubleshooting.
No. TTL affects cache duration, but downtime is mainly controlled by how the old and new origins are handled.
Often some form of write control is useful during the final sync, but the method depends on order volume and migration approach.
Old origin availability, database state, DNS reversal steps, SSL status and a decision point for aborting the cutover.