Concrete Calculator

Estimate cement bags, sand and aggregate for any slab, column, beam or footing — with standard M10 to M20 mix ratios.

  • Standard mix ratios
  • Free, no sign-up
  • Works on phone and desktop
  • 100% private — runs in your browser
Sharjeel Tahir

By Sharjeel Tahir

WordPress & Technical SEO Specialist · Lahore, Pakistan

Estimates based on standard construction formulas — actual quantities vary with sand moisture, compaction and site wastage. See the limitations section below.

A 10 × 10 ft slab, 6 inches thick, in a 1:2:4 mix needs roughly 9 bags of cement (50 kg), 22 cubic feet of sand and 44 cubic feet of aggregate. This free concrete calculator estimates cement, sand, aggregate and water for any slab, column, beam or footing from feet-and-inches measurements and standard M10–M20 mix ratios.

How do you calculate cement, sand and aggregate for concrete?

Every concrete estimate follows the same three steps. First, find the wet volume of the concrete: length × width × thickness, all in the same unit. A slab 20 ft long, 15 ft wide and 5 inches thick is 20 × 15 × (5/12) = 125 cubic feet. Second, convert wet volume to dry volume by multiplying by 1.54. Wet concrete compacts, and sand bulks in the presence of moisture, so the dry ingredients occupy about 54% more volume than the finished concrete — this 1.54 factor is the standard rule used by site engineers across Pakistan and India. Third, split the dry volume by the mix ratio: for 1:2:4, cement gets 1/7, sand 2/7 and aggregate 4/7 of the dry volume. Finally, convert cement volume to bags: one 50 kg bag of cement occupies about 1.25 cubic feet (0.035 cubic metres).

What do the 1:2:4 and 1:1.5:3 mix ratios mean?

A mix ratio is written as cement : sand : coarse aggregate by volume. 1:2:4 means one part cement, two parts sand and four parts aggregate. Common nominal mixes are:

  • 1:1.5:3 (M20) — general reinforced concrete: slabs, beams, columns in houses and small buildings.
  • 1:2:4 (M15) — reinforced work with moderate strength needs; the most common house-construction mix in Pakistan.
  • 1:3:6 (M10) — plain cement concrete for foundations, footings and floor bases.
  • 1:4:8 — lean concrete used as a levelling bed under footings, not for structural loads.

The "M" number is the target compressive strength in N/mm² after 28 days. Higher-strength structural work (commercial buildings, bridges) uses designed mixes rather than these nominal ratios, and those should come from a structural engineer.

How many cement bags are in 1 cubic metre of concrete?

For the standard mixes, one cubic metre of finished concrete needs approximately: 8 bags in a 1:1.5:3 (M20) mix, 6.4 bags in 1:2:4 (M15), 4.4 bags in 1:3:6 (M10) and 3.2 bags in 1:4:8. The maths behind it: 1 m³ wet becomes 1.54 m³ dry; in 1:2:4 the cement share is 1/7 of that, or 0.22 m³, and a 50 kg bag is 0.035 m³ — so 0.22 ÷ 0.035 ≈ 6.3 bags. The calculator above applies the same logic to your exact dimensions, so a small footing and a large slab both get a precise answer instead of a rough per-metre guess.

How do I use this calculator?

Enter the length and width in feet and the thickness in inches — the units most Pakistani site drawings use. Pick the mix ratio your engineer or mason specified (1:2:4 is the default for ordinary RCC house work), and choose a wastage allowance; 5% is a sensible default, 10% if the site is difficult or the formwork is uneven. The results update instantly: cement in 50 kg bags, sand and aggregate in cubic feet, mixing water in litres, and both wet and dry volumes. Round the bag count up when ordering — a half bag short on pour day is far more expensive than a bag left over.

What are the limitations?

These are estimates, not a structural design. The 1.54 dry-volume factor is an industry rule of thumb; real sand moisture and compaction vary, which is why the wastage allowance exists. The calculator assumes plain rectangular geometry — for L-shaped slabs, split them into rectangles and add the results, and for round columns use π × radius² × height for the volume. Water is a guide only: the correct water–cement ratio depends on the sand's moisture and the required workability, so follow the engineer's specification on site. Reinforcement steel is not included. For anything beyond ordinary house construction, have the quantities verified by a qualified civil engineer.

Frequently asked questions

Why is the wet volume multiplied by 1.54?

Wet concrete compacts as it is placed and vibrated, and dry sand and aggregate contain voids that cement paste fills. Multiplying by 1.54 converts the finished (wet) volume to the loose (dry) volume of ingredients. It is a widely used site rule of thumb, not an exact physical constant.

How much water does concrete need per bag of cement?

At a water–cement ratio of 0.5, one 50 kg bag needs about 25 litres of water. Wetter mixes are easier to place but weaker; never add extra water on site beyond the specified ratio just to make pouring easier.

What is the difference between M15 and M20 concrete?

M15 (typically 1:2:4) reaches 15 N/mm² compressive strength at 28 days; M20 (1:1.5:3) reaches 20 N/mm². M20 uses more cement per cubic metre, so it costs more but is the standard for structural RCC slabs, beams and columns.

How many cubic feet is one bag of cement?

One 50 kg bag of cement occupies about 1.25 cubic feet (0.035 cubic metres), based on a bulk density of roughly 1440 kg/m³. This calculator uses that figure to convert cement volume into bags.

Should I add wastage to my material estimate?

Yes. Spillage, uneven formwork, over-excavation and cutting losses mean you almost always need more than the theoretical quantity. 5% is typical for careful sites; use 10% for rough or difficult conditions.

Can I use this for a round column or circular footing?

Yes — calculate the wet volume yourself (π × radius² × height, in consistent units) and enter equivalent rectangular dimensions that give the same volume, or run the calculator with the cylinder's volume converted to a rectangular slab of the same thickness.